{"id":2867,"date":"2013-11-28T08:41:48","date_gmt":"2013-11-28T08:41:48","guid":{"rendered":"http:\/\/www.filasolutionsblog.com\/?p=2867"},"modified":"2021-07-29T14:58:43","modified_gmt":"2021-07-29T12:58:43","slug":"treatment-of-the-new-doha-airport","status":"publish","type":"post","link":"https:\/\/blog.filasolutions.com\/en\/treatment-of-the-new-doha-airport\/","title":{"rendered":"Fila flies to Qatar for treatment of the new Doha airport"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p><a href=\"\/wp-content\/uploads\/2013\/11\/Air-Qatar-New-Doha-International-Airport.jpg\"><img decoding=\"async\" class=\" wp-image-2839 alignleft\" style=\"margin: 10px;\" src=\"\/wp-content\/uploads\/2013\/11\/Air-Qatar-New-Doha-International-Airport-300x180.jpg\" alt=\"Air-Qatar-New-Doha-International-Airport\" width=\"270\" height=\"162\" srcset=\"https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/Air-Qatar-New-Doha-International-Airport-300x180.jpg 300w, https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/Air-Qatar-New-Doha-International-Airport-1024x615.jpg 1024w, https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/Air-Qatar-New-Doha-International-Airport-768x461.jpg 768w, https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/Air-Qatar-New-Doha-International-Airport.jpg 1200w\" sizes=\"(max-width: 270px) 100vw, 270px\" \/><\/a>Another big FILASERVICE project has been underway for more than a year now: <strong>treatment of the surfaces in natural stone<\/strong> at the <strong>new Doha international airport (NDIA) in Qatar<\/strong>.<\/p>\n<p>NDIA is one of the biggest ongoing projects in the world. This airport will have a total surface area of over 22 km\u00b2 and will handle a maximum of 50 million passengers, but above all, it will be large enough to accommodate the Airbus A380, the biggest airliner in the world. Despite its huge size, <strong>the airport is designed to have the lowest environmental impact possible<\/strong>, thanks to careful management of energy savings and the materials used.<\/p>\n<p><a href=\"\/wp-content\/uploads\/2013\/11\/New-Doha-International-Airp.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\" wp-image-2841 alignleft\" style=\"margin: 10px;\" src=\"\/wp-content\/uploads\/2013\/11\/New-Doha-International-Airp-300x224.jpg\" alt=\"New-Doha-International-Airp\" width=\"270\" height=\"202\" srcset=\"https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/New-Doha-International-Airp-300x224.jpg 300w, https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/New-Doha-International-Airp-1024x765.jpg 1024w, https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/New-Doha-International-Airp-768x574.jpg 768w, https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/New-Doha-International-Airp.jpg 1296w\" sizes=\"(max-width: 270px) 100vw, 270px\" \/><\/a>Plenty of attention is also being reserved for <strong>treatment of the different surfaces in porcelain tiles and natural stone<\/strong> such as quartzite, sandstone, <strong>marble<\/strong>, limestone and granite. For this reason the designers have entrusted treatment to the <strong>FILA professionals<\/strong>.<\/p>\n<p>The FILASERVICE technicians carried out various <strong>studies and analyses of the materials<\/strong> with preliminary testing in the FILA labs to find the best solutions, strictly<strong> water-based (VOC free)<\/strong>, to protect these delicate surfaces from traffic and wear. They then provided <strong>technical assistance<\/strong> for training of the personnel who will, over the next few months, be in charge of the treatment stage: from washing after laying to protection and maintenance.<\/p>\n<p><a href=\"\/wp-content\/uploads\/2013\/11\/Boeing_777-3DZER_-_Qatar_Airways_A7-BAI.jpg\"><img decoding=\"async\" class=\" wp-image-2840 alignleft\" style=\"margin: 10px;\" src=\"\/wp-content\/uploads\/2013\/11\/Boeing_777-3DZER_-_Qatar_Airways_A7-BAI-300x200.jpg\" alt=\"Boeing 777-3DZ(ER) - Qatar Airways (A7-BAI)\" width=\"270\" height=\"180\" srcset=\"https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/Boeing_777-3DZER_-_Qatar_Airways_A7-BAI-300x200.jpg 300w, https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/Boeing_777-3DZER_-_Qatar_Airways_A7-BAI-1024x684.jpg 1024w, https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/Boeing_777-3DZER_-_Qatar_Airways_A7-BAI-768x513.jpg 768w, https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/Boeing_777-3DZER_-_Qatar_Airways_A7-BAI-1536x1025.jpg 1536w, https:\/\/blog.filasolutions.com\/wp-content\/uploads\/2013\/11\/Boeing_777-3DZER_-_Qatar_Airways_A7-BAI.jpg 1600w\" sizes=\"(max-width: 270px) 100vw, 270px\" \/><\/a>Thanks to use of <strong>solvent-free, low VOC-emission FILA protectors<\/strong>, some of which help toward achieving <strong>LEED\u00ae credits and GEV certification<\/strong>, even huge jobs like an international airport can keep their environmental impact down to a minimum.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Another big FILASERVICE project has been underway for more than a year now: treatment of the surfaces in natural stone at the new Doha international airport (NDIA) in Qatar.<\/p>\n","protected":false},"author":654,"featured_media":2842,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[280],"tags":[],"surface":[2000,2001],"room":[],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/posts\/2867"}],"collection":[{"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/users\/654"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/comments?post=2867"}],"version-history":[{"count":0,"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/posts\/2867\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/media\/2842"}],"wp:attachment":[{"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/media?parent=2867"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/categories?post=2867"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/tags?post=2867"},{"taxonomy":"surface","embeddable":true,"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/surface?post=2867"},{"taxonomy":"room","embeddable":true,"href":"https:\/\/blog.filasolutions.com\/en\/wp-json\/wp\/v2\/room?post=2867"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}